Veresen Midstream Limited Partnership, VMLP, (“Company”) intends to construct an addition of a new 100 MMSCFD gas processing train, Train 7, at the Hythe Brainard Gas Plant at 11-18-74-12 W6M; this program is referred to as the Raptor Program.
From June to December 2020, Tetrad performed the entire onsite scope of insulation, cladding, blankets and heat medium tubing installation for the project including nearly 9,000 LM of insulation, 4000 blankets and 4000 LM of 1" heat medium tubing. Tetrad also performed many smaller scopes throughout the site, including weather shield install on the incinerator stack, various other shielding work, building flashing and rain cap and building hood design, fabrication and installation.